InstallationInstructions36″ Glass CanopyChimney Vent HoodZV90049-8032804-06 JR
9INSTALL FRAMING FOR HOODSUPPORTIMPORTANT— Framing must be capable ofsupporting 100 lbs.If drywall is present, mark the screw hole locations forthe to
Installation InstructionsINSTALL DUCT BRACKETThe duct bracket should be installed against theback wall and flush with the ceiling. This bracket willho
11Installation InstructionsPREPARE THE HOOD• Place the hood on a padded surface.• Position the motor housing at the back of the hood.Electrical connec
CONNECT DUCTWORK• Install ductwork, making connections in thedirection of airflow as illustrated.• Push duct over the exhaust outlet and damper.• Secu
13Installation InstructionsINSTALLATION—VENTED TO THE OUTSIDECONNECT ELECTRICALVerify that power is turned off at the source.WARNING:If house wiring i
INSTALL DUCT COVERS• Place the decorative ductcovers on top of the hood.NOTE: The inside (upper) duct piece has holes on oneend. The holes are intende
15Installation InstructionsINSTALLATION—RECIRCULATINGDUCTWORK, WIRING LOCATIONS• Determine the exact location of the vent hood.• Locate the template p
Installation InstructionsINSTALLATION—RECIRCULATING16INSTALL DUCT BRACKETThe duct bracket should be installed against theback wall and flush with the
17Installation InstructionsINSTALLATION—RECIRCULATINGPREPARE THE HOOD• Place the hood on a padded surface.• Position the motor housing at the back of
CONNECT ELECTRICALVerify that power is turned off at the source.WARNING:If house wiring is not 2-wire with a ground wire, a ground must be provided by
14-5/8″to top ofbracketCL▼ALIGN BOTTOM EDGE WITH PENCIL LINE, INDICATING BOTTOM OF THE HOODDrill 2 (two) 3/16″ pilot holes through studs or rear wall
19Installation InstructionsINSTALLATION—RECIRCULATINGINSTALL FILTERSIMPORTANT: Check to be sure that the mainON/OFF switch next to the motor is in the
Printed in ItalyNOTE: While performing installations described in this book,safety glasses or goggles should be worn.For Monogram®local service in you
Safety Information2BEFORE YOU BEGINRead these instructions completely and carefully.• IMPORTANT— Save these instructions forlocal inspector’s use. • I
INSTALLATION OPTIONSNOTE: Installation height should be measured from thecooking surface to the outer glass sides.This hood may be installed onto a wa
Installation Preparation4ADVANCE PLANNING• Determine the exact location of the vent hood.• Plan the route for venting exhaust to the outdoors.• Use th
DUCT FITTINGSUse this chart to computemaximum permissible lengths forduct runs to outdoors.NOTE: Do not exceed maximumpermissible equivalent lengths!M
Installation PreparationREMOVE THE PACKAGINGCAUTION: LIFT THE HOOD OUT OF THE BOXBY THE CENTER METAL PORTION. DO NOT LIFT BY THEGLASS SIDES.PRUDENCE :
7Wall Mount ZV900Installation HeightsActual *PossibleCeiling *Possible VENTED RECIRCULATINGHeight Installation Height Installation Height7′ 11″ 24″ to
CHECK INSTALLATION HARDWARELocate the hardware accessory box packed with the hood and check contents.Installation Preparation29-7/8"11-1/2"1
Commentaires sur ces manuels