Monogram.®If you have questions, call 800-GE-CARES or visit our website at: www.monogram.comInstallationInstructionsIsland Vent HoodsModels:ZV42IZV54I
10Plan the Location of the Hood and Ductwork• Use a plumb bob to check the location. Thecountertop/cooktop below the hood must be centeredwith the hoo
11Top View – Ceiling Joists Run Perpendicular to Front of HoodTop View – Ceiling Joists at Angle with Front of HoodInstallation InstructionsSTEP 1 CO
12STEP 1 CONSTRUCT CEILING SUPPORT CONTINUEDInstallation InstructionsDuctwork• Use the shortest and straightest duct route possible.For satisfactory
13• Select the template for your hood size.• Align the template with the marks on the ceiling andtape in place.– Be sure the template is oriented corr
14Installation InstructionsSTEP 4 INSTALL ACCESSORY (OR SUPPLIED) SUPPORT AND DUCT COV-ERSInstall supplied support frame OR telescoping accessory fra
15Installation InstructionsSTEP 5 INSTALL DUCT TRANSITION WITH DAMPERIMPORTANT: Remove shipping tape from damper andcheck that damper moves freely.• P
16Installation InstructionsSTEP 8 CONNECT ELECTRICALVerify that power is turned off at the source.WARNING: If house wiring is not 2-wire with a ground
17Installation InstructionsSTEP 11 INSTALL FILTERS • Insert the filter into the upper opening and drop intothe trays.• To remove the filters, grasp th
18STEP 13 INSTALL SUPPLIED DUCTCOVER AND TOP COVERSTEP 14 FINALIZE INSTALLATION• Check all lamps to assure tightness in sockets.• Turn power on at the
19STEP 15 INSTALLATION CHECKLISTCheck Blower Safety Screw Ensure that blower safety screw is securely tightened.See page 16, Step 9. If screw is mis
2Installation InstructionsWARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY, OBSERVE THE FOLLOWING:A. Use this unit only in the manner i
Pub. No. 49-80209-1Dwg. No. 164D4290P36109-03 JRNote: While performing installations described in this book,safety glasses or goggles should be worn.F
3Design Information42” HOOD DIMENSIONSModel ZV42IModel ZV54ICONTENTSDesign InformationProduct Dimensions...
4Design InformationDUCT COVER ACCESSORIESZV42I* 9" for ceiling heights 7’11" to 8’5" using the suppliedsupport frame and duct cover.Ord
5Advance PlanningADVANCE PLANNINGDuctwork Planning• These vent hoods are equipped for 10” round ductwork. • Determine the exact location of the vent h
INSTALLATION HEIGHT REQUIREMENTS• These vent hoods must be installed 30" min. and 36" max.above the cooking surface – regardless of the ceil
Equivalent Quantity TotalDuct Piece Length* Used LengthRound, 1 ft.straight (per footlength)1 ft.3-1/4" x 24" (per footstraight length)90° e
8Installation PreparationTOOLS AND MATERIALS REQUIRED(NOT SUPPLIED)Pencil and tape measurePliersElectric or battery operated drilland 3/16", bits
9Installation PreparationPARTS PROVIDEDLocate the parts packed with the hood.HARDWARE PACKAGELocate and check contents. Screws shown actual size.2 Gre
Commentaires sur ces manuels