GE BL Series Guide d'installation Page 4

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 6
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 3
1
For the luminaires that will be in the middle of the run,
insert two pins into one end only. Slide pins into the
bottom screw grooves, leaving approximately 20-22mm
exposed.
2
Pre-install the two M3x12 mm screws with the wingnuts
into bracket. The screws should be in the same hole type.
3 4
5
Insert four mounting brackets (two per side) into
grooves on both sides of luminiare. Position brackets
approximately 2-3mm from ends. Do not tighten
wingnuts yet.
Fasten one end cover (BL4X - SKU 85598, BL6X - SKU 63263)
on the rst and last luminaires only with four M3 screws.
Always use a star washer under one of the top screws to
ensure ground continuity. Use retained end covers, star
washers and screws.
Note: The luminaires between the rst and last luminaire
do not require end covers.
Place luminaires into ceiling grid.
Do not
tighten yet
Must use star
washer on top hole
20-22mm
End cover
First luminaire Middle luminaire(s) Last luminaire
End coverNo end covers
Pins
Ceiling grid
Pins
Joiner Pin
Luminaire Installation
Safety screw holes.
One is needed,
more are optional.
With the supplied universal bracket the product is
compatible with the following USG type grids:
DX, DXI, DXT, DXF, DXM.
Reference diagram (right) to determine which hole to
use for a given grid.
Vue de la page 3
1 2 3 4 5 6

Commentaires sur ces manuels

Pas de commentaire