GE BL Series Guide d'installation Page 5

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 6
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 4
6
8
7
9
Plug together wires between luminaires.
Join mounting brackets together with M4 hex head screw
and nut. Also tighten wingnuts. Make sure that there is no
visible gap between xtures. Slightly reposition brackets
and join them again to have proper t.
Note for City of Chicago: Luminaires are designed to meet City of Chicago Environmental Air (CCEA) requirements. During installation,
in any case where the opening between the xtures exceeds the 0.05” CCEA requirement, a sealant tape can be applied over the
opening. Tape has to meet the requirements of UL181A-P and UL181B-FX standards and meet requirements for UL-723.
Carefully align pins of one luminaire with grooves of next
luminiare, then push them completely together, taking
care not to pinch wires.
Note: A rubber mallet may be required to complete this
step. Hammer the luminaires only on the top edge, not
the bottom.
For added safety, use additional ceiling grid screws to
permanently x brackets to grid.
Pin
One safety screw per
bracket is mandatory,
additional screws are
optional
WARNING
Risk of Injury. Improper mounting bracket installation
may cause injury or property damage.
Diffuser Installation
1A 1B
Option - two diffusers (primary and anti-glare): Tilt
and slide both diffusers into base of luminaires, making
sure the diffuser with the green protective lm is placed
on the bottom (remove lm rst). The last diffusers will
need to be trimmed to t in Step 2.
Option - one diffuser (primary): Tilt and slide diffusers
into base of luminaires. The last diffuser will need to
be trimmed to t in Step 2.
Bottom: Anti-glare diffuser with
green lm faces up. Remove
before sliding in.
Primary diffuser
Top: Primary diffuser with no lm
Vue de la page 4
1 2 3 4 5 6

Commentaires sur ces manuels

Pas de commentaire