GE GERAB46A Manuel d'installation

Naviguer en ligne ou télécharger Manuel d'installation pour Non GE GERAB46A. GE GERAB46A Get installation instructions Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 12
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Installation instructions
for your new
Before you begin—Read these instructions completely and carefully.
IMPORTANT—OBSERVE ALL GOVERNING CODES AND ORDINANCES.
Note to Installer—Be sure to leave these instructions with the
Consumer.
Note to Consumer—Keep these instructions with your Built-In
Air Conditioner Owner’s Manual and Installation
Instructions for future reference.
1
CRITICAL DIMENSIONS
NOTE:
Care should be taken in location of electrical
supply entry in relationship to wall sleeve to ensure
access to power once the unit is installed.
RECOMMENDED
DIMENSIONS INSTALLATION CLEARANCE
A Top of case to finished ceiling—3min.
B Projection of case into room—1/4min.
If more than 6of the case projects
into the room, other support is
recommended.
C Projection of case to outside—1/4min.
D Height above finished floor or top of
carpet—0min.
E Left/Right side of case to adjacent
wall—2min.
31-61488
10-08 JR
INSTALL CASE LEVEL IN ALL DIRECTIONS
NOTE: Handle the case carefully.
CASE LOCATION
As a general rule the air conditioner should
be located in an outside wall to ensure proper
distribution of conditioned air. It should be located
in a portion of the wall where there is no electrical
wiring or plumbing, and where there are no
obstructions immediately inside or outside.
Ceiling
“A”
“B”
“C”
Roomside
Outside wall
“D”
Finished floor or top of carpet
Outside wall
“E”“E”
Top of case
Printed in the United States
RAB46A, RAB47A
and RAB48A Room
Air Conditioner Case
for AJ Series Built-In
Models
Vue de la page 0
1 2 3 4 5 6 ... 11 12

Résumé du contenu

Page 1 - Air Conditioner Case

Installation instructionsfor your newBefore you begin—Read these instructions completely and carefully.IMPORTANT—OBSERVE ALL GOVERNING CODES AND ORDIN

Page 2

2NOTA: Si se encuentra instalada una almohadillaaislante para caja de pared RAB47A, RAB48A o RAK66, quítela antes de instalar la unidad.PASO 1Preparac

Page 3

3PASO 3Instalación de la caja en la abertura de la pared1. Coloque la caja dentro de la pared. Consulte la tablade la página 1 sobre proyección del la

Page 4 - DRAIN KIT (optional)

Las especificaciones pueden sufrir cambios sin previo avisoUn producto de calidad de GE Appliances4REQUERIMIENTOS ELÉCTRICOS (230V/208V)Deben tomarse

Page 5 - RAB47A et RAB48A

STEP 1Preparation of the wallThe wall case should be installed during constructionand lintels should be used to support the block abovethe wall case.

Page 6 - 8 po) min

STEP 3Installation of the case in the wall opening1. Position the case into the wall. Refer to chart onpage 1 for roomside projection. The rear (outsi

Page 7 - Appareil

Specifications subject to change without noticeA Quality Product of GE Appliances4ELECTRICAL REQUIREMENTS (230V/208V)Provisions should be made to have

Page 8 - Prises de courant murales

Directives d’installationde votreAvant de commencer – Veuillez lire attentivement toutesles directives qui suivent.IMPORTANT – OBSERVEZ TOUS LES CODES

Page 9 - Caja de acondicionador

ÉTAPE 1Préparation du murLe boîtier mural doit être installé pendant la construction et il faut utiliser des linteaux poursoutenir le bloc au-dessus d

Page 10 - 8″ (66,4 cm)

3ÉTAPE 3Installation du boîtier dans l’ouverture du mur1. Placez le boîtier dans le mur. Reportez-vous au tableau de la page 1 pour connaître la parti

Page 11 - Gabinete

Les spécifications peuvent être modifiées sans préavisUn produit de qualité de GE Appliances4ALIMENTATION ÉLECTRIQUE (230 V/208 V)Il faut prévoir une

Page 12 - KIT DE DRENAJE (opcional)

Instrucciones de instalación para su nuevaAntes de comenzar — Lea estas instrucciones por completo y con detenimiento. IMPORTANTE — CUMPLA CON TODOS L

Commentaires sur ces manuels

Pas de commentaire