Ge ZV850 Manuel d'utilisateur Page 8

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 16
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 7
8
Installation
36" Island Vent Hood
Check
Installation
Hardware
3
Step
Check contents of the required
accessory, ZX858, ZX859 or ZX8510.
Locate the hardware accessory box packed
with the hood and check contents.
4 Hex head
wood lag screws
(6mm x 2-1/2")
or
(1/4 x 2-1/2")
4 Flat Washers
8 Frame Attachment
Screws with Washers
(attached to
accessory support
frames)
Template
2 Phillips Head
Decorative Screws
2 Side Bars With 4 Machine Screws
3 Filters
Check service manual envelope taped
to the front on the hood to be sure it
contains one stop screw. Leave this
screw in the envelope.
4 (10mm) Nuts and Lock Washers
2
Remove the
Packaging
Step
The vent hood is packed separate from the
required accessory ZX858, ZX859 or ZX8510.
• Remove the frame, cover, parts box, side bars
and packaging.
• Remove junction box cover.
• Install strain relief onto junction box cover.
Decorative Duct Covers
Front of Hood
Mounting Screw Holes
Support Frames
with 8 Screws
and 8 Washers
Vue de la page 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Commentaires sur ces manuels

Pas de commentaire