Installation Instructions
STEP 10 INSTALL IMPLEMENT
RODS
Use a flat blade screwdriver to install stand-offs into
the bottom of the hood.
Align implement rod to stand-offs with the screw hole
towards the inside of the hood. Secure the rod to the
stand-offs with the supplied Allen wrench.
Follow the same procedure on the opposite side.
FINALIZE INSTALLATION
Install the supplied infrared bulb(s).
See the Owner’s Manual for instructions to test
operation.
Screw
Stand-offs
Into
Hood
Use Allen
Wrench to
Secure Rod
to Stand-offs
STEP 9 INSTALL SHELF “ONLY”
Remove shelf packaging and protective film.
If installing the shelf alone, without the backguard,
place shelf against the bottom of the hood and mark
screw hole locations “B” on the wall.
Drill two 1/8" pilot holes.
If drill did not enter studs, enlarge holes to 3/8".
Insert wall anchors into enlarged holes. Remove
screws from wall anchors.
Install two shoulder screws into holes “D” in the
bottom of hood flange leaving 1/8" gap.
Engage shoulder screws into the keyhole slots in the
top of the shelf. Slide shelf towards the left to lock
into place.
Install two 3/4" long machine screws through the
bottom of the shelf into the bottom hood flange,
location “E”.
1/8"
Gap
D
E
Mounting
Holes
for Shelf (B)
D
E
B
B