GE AV-300i Manuel d'utilisateur Page 17

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 30
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 16
17
7. Pre Power Checks
The following should be checked before switching ON the Drive:
Grounds / Grounding
Verify ground connections between the drive and motor
Verify AC Input, AC Output and control wiring aren’t grounded
Connections
Verify AC Input (U1/L1, V1/L2, W1/L3), AC Output (U2/T1, V2/T2, W2/T3), DC link connection (C,D), Motor thermistor
(78, 79), OK Relay (80, 82), Relay 2 (83,85) and regulation board points (1.....46, XS, XE) connections.
Regulator Terminal Board Inputs:
12 ENABLE DRIVE (close to activate)
13 START (close to activate)
14 FAST STOP (open to cause a stop)
15 EXTERNAL FAULT (open to cause a stop)
16 Common for terminal board inputs
18 + 24V Common
19 +24VDC (internal power supply)
Set inputs on the regulator terminal board as follows:
Enable drive (terminal 12) and Start (terminal 13) OPEN
Fast stop (terminal 14) and External fault (terminal 15) CLOSED
Record motor name plate data, encoder information, gearbox data.
MOTOR DATA
Vue de la page 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 29 30

Commentaires sur ces manuels

Pas de commentaire