Ge PVB94STSS Manuel d'utilisateur Page 9

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 16
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 8
9
Installation Preparation
VENTING OPTIONS
• The downdraft vent is shipped with the
discharge outlet pointing straight down
and can be changed to the left or right
side.
7KHEORZHURXWOHWLVVL]HGIRU[
and can be transitioned to 6" round.
2UGHU-;5%IRULQVWDOODWLRQRIWKH
EORZHUDQGPRWRUEHORZWKHÀRRU
Side-to-Side Adjustments:
The entire blower mounting plate can be
DGMXVWHGWRWKHOHIWRUULJKW7KLV
will help to align vent discharge to house
ductwork.
Discharge Direction
The blower assembly may be removed and turned
IRUDOHIWRUULJKWVLGHGLVFKDUJH
• A left or right 90° direction adjustment should be
performed before dropping into the countertop
opening.
• Flatten the shipping box to use as a pad.
• Lay the vent on its back and onto the pad.
To change to a left or right discharge:
• Remove the 4 screws holding the blower and the
mounting plate assembly to the downdraft vent.
Retain screws.
• Remove blower assembly; turn it over to access the
4 nuts holding the blower to the mounting plate.
Remove the nuts.
Discharge Down
$V6XSSOLHG
Loosen Screws
to Adjust
WR
Left or Right
IMPORTANT: Do not lift motor by the power cable.
• Turn the blower to the left or right discharge
direction and reinstall the 4 nuts.
• Reinstall blower and mounting plate with original
screws.






Discharge Down
$V6XSSOLHG
Discharge Left
Discharge Right
Vue de la page 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Commentaires sur ces manuels

Pas de commentaire