GSD2000GE Consumer & IndustrialAppliancesInstallation InstructionsBuilt-In DishwasherIf you have questions, call 800.GE.CARES (800.432.2737) or vi
10Dishwasher Installation923-10VTurn Legsto AdjustFigure SSTEP 11: SLIDE DISHWASHER INTO CABINETIMPORTANT – Do not push against the front panel with
STEP 13: FASTEN DISHWASHER TO UNDERSIDE OF COUNTERTOP OR SIDES OF CABINET In this step you will need the two 5/8" Phillips-head wood screws set
Dishwasher Installation12Waste Tee InstallationMethod 1 – Air gap with waste tee or disposer Disposer InstallationWaste Tee InstallationMethod 2 – “Hi
Dishwasher Installation#282 French If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer. When house wi
Dishwasher Installation– Check the electrical connection to the water valve. The red electrical connector should be plugged into the dishwasher wat
Figure AADishwasher InstallationSTEP 20: REPLACE ACCESS PANEL AND TOEKICKIn this step you will need the panels and the two screws set aside in Step 4
GE Consumer & IndustrialGeneral Electric CompanyLouisville, Kentucky 40225GEAppliances.com206C1559P195 31-3025507-09 JRSPECIFICATIONS SUBJECT TO
GSD2000Appareils ménagers GE Consumer and IndustrialInstructions d’installationLave-vaisselle encastréPour toute question, composez le 1.800.561.3344
OUTILS NÉCESSAIRES : Lunettes de sécurité Tourne-écrous de 6,3 mm (1/4 po) et de 7,9 mm (5/16 po) Lampe de poche Gants Clé à molette (15,2
Préparation pour l'installation – Ouverture dans les armoiresPRÉPARATION DE L'OUVERTURE DANS LES ARMOIRES Figure A• L'ouverture dans l
TOOLS YOU WILL NEED: Safety glasses 1/4" and 5/16" nutdrivers Flashlight Gloves Adjustable wrench (6”) Phillips-head screwdrive
MÉTHODE N° 1 – Coupure anti-refoulement avec raccord en T ou broyeur à déchetsInstallation avec broyeur à déchetsMÉTHODE N° 2 – Boucle de vidange élev
5Préparation des armoires et cheminement des fils• Les fils peuvent entrer dans l’ouverture du côté droit, du côté gauche, de l’arrière ou du plancher
6Préparation pour l’installation – Alimentation en eau chaudePRÉPARATION DE L’ALIMENTATION EN EAU CHAUDEConduite d’eau chaude• La conduite peut entre
7ÉTAPE 2 : VÉRIFICATION DE L’ÉQUILIBRE DE LA PORTE • Sans enlever la base de bois du lave-vaisselle, vérifiez l’équilibre de la porte en l’ouvrant e
• Installez la bague anti-traction sur le support de la boîte de jonction.• Faites passer le cordon d’alimentation dans la bague anti-traction, puis
BracketAttachmentScrews(2 EachSide)Side-MountingBracketsTub Frame06F-1847H9Remarque : Le boyau de vidange fourni avec le lave-vaisselle mesure enviro
10Installation du lave-vaisselle923-10VTurn Legsto AdjustFigure SÉTAPE 11 : INSTALLATION DU LAVE-VAISSELLE DANS L’OUVERTUREIMPORTANT – Ne poussez pas
11Installation du lave-vaisselleÉTAPE 14 : RACCORDEMENT DE L’ALIMENTATION EN EAURaccordez la conduite d’alimentation en eau au coude de 90° install
Figure WCollierCollierRaccordDishwasher Installation12Installation avec raccord en TMéthode n° 1 – Coupure anti-refoulement avec raccord en T ou broye
Installation du lave-vaisselleÉTAPE 17 : INSTALLATION DU COUVERCLE DE LA BOÎTE DE JONCTIONSi le couvercle de la boîte de jonction est déjà installé,
Installation Preparation – EnclosurePREPARE DISHWASHER ENCLOSURE Figure ATo reduce the risk of shock, fire, or injury to persons, the installer must e
Installation du lave-vaisselle– Vérifiez le raccordement électrique de l’électrovanne. Le connecteur électrique rouge doit être branché sur l’électrov
Figure AAInstallation du lave-vaisselleÉTAPE 20 : RÉINSTALLATION DU PANNEAU D’ACCÈS ET DU PANNEAU INFÉRIEURAu cours de cette étape, vous aurez besoin
GE Consumer & IndustrialGeneral Electric CompanyLouisville, Kentucky 40225GEAppliances.com206C1559P195 31-3025507-09 JRLES SPÉCIFICATIONS PEUVEN
METHOD 1 – Air Gap with Waste Tee or DisposerDisposer InstallationMETHOD 2 – High Drain Loop with Waste Tee or DisposerProvide a method to attach the
#282 FrenchThe improper connection of the equipment- grounding conductor can result in electric shock. Check with a qualified electrician or service
6Installation Preparation – Hot Water SupplyPREPARE HOT WATER SUPPLYHot Water Line• The line may enter from either side, rear or floor within the shad
7STEP 2: CHECK DOOR BALANCE • With the dishwasher on the wood base, check the door balance by opening and closing the door.• The door is properly bala
• Install strain relief in the junction box bracket.• Insert the power cord through the strain relief and tighten.• Make sure black, white and green d
BracketAttachmentScrews(2 EachSide)Side-MountingBracketsTub Frame06F-1847HSkip this step if the underside of countertop is wood or woodlike material.•
Commentaires sur ces manuels