Ge ZGU48L6R Manuel d'utilisateur Page 8

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 12
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 7
Alternate Bracket
Screw Holes
“L” Bracket
8
INSTALL COOKTOP
• Lower the cooktop into the opening. Make sure the
cooktop is evenly seated and supported. A side frame
gasket will seal the cooktop to the countertop.
“L” brackets with screws are provided to secure the
cooktop to the countertop or to adjacent cabinetry.
Alternate screw hole locations on the sides of the
cooktop allow for varying thicknesses of countertops
or side cleats.
Select the bracket location; secure the bracket to the
cooktop with 2 screws.
Drive one screw through the bottom of the “L” bracket
and into countertop or side cleats.
STEP 3
CONNECT COOKTOP TO GAS
A manual shut-off valve must be installed where
it will be accessible.
Assure that gas is turned off at the shut-off valve.
Install the supplied pressure regulator onto the end
of the gas inlet.
You can install a 90° elbow (not supplied) onto the
gas inlet and route the gas connections to avoid
interference with drawers or other cabinetry features.
Make sure the regulator is installed in the right
direction. See arrow on the underside of the regulator.
NOTE: Instead of using solid piping to connect to
pressure regulator, an approved flexible metal appliance
connector may be used between the pipe stub and the
shut-off valve to the pressure regulator, if local codes
permit.
Appropriate flare nuts and adapters are required at
each end of the flexible connector.
WARNING: Do not use a flame to
check for gas leaks.
AVERTISSEMENT :
Il ne faut pas utiliser de flamme pour vérifier
s’il y a des fuites.
IMPORTANT: Disconnect the cooktop and the individual
shut-off valve from the gas supply piping system during
any pressure testing of that system at test pressures
greater than 1/2 psig. Isolate the cooktop from the gas
supply piping system by closing the individual manual
shut-off valve to the cooktop during any pressure testing
of the gas supply piping system at test pressures equal
to or less than 1/2 psig.
Turn on gas and check for leaks:
–Use a liquid leak detector at all joints and connections
in the system.
STEP 4
Regulator
(Supplied)
Solid Piping
or Flexible
Connector
Shut-Off
Valve
Pipe Stub From
House Gas Supply
Cooktop Burner Box
Gas Inlet
Installation
Note: Pipe stub extends
about 1" below burner box.
Vue de la page 7
1 2 3 4 5 6 7 8 9 10 11 12

Commentaires sur ces manuels

Pas de commentaire